Monument Boulevard Signal Upgrade Project, PJ 2578

The work to be done consists of, in general, the installation of fiber optic communications cable in conduit, pull boxes, fiber optic splicing, along Monument Boulevard, modifications of traffic signals including reflective traffic signal borders and battery backup system upgrades, and such other items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed.
Specifications (click to expand/collapse)
Name Size
2578 Final Specs 4.2 MB