Monument Boulevard Signal Upgrade Project, PJ 2578

The work to be done consists of, in general, the installation of fiber optic communications cable in conduit, pull boxes, fiber optic splicing, along Monument Boulevard, modifications of traffic signals including reflective traffic signal borders and battery backup system upgrades, and such other items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed.
Addendum 1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2023-07-13_2578 Addendum No 1 174.0 KB
2578 Monument Blvd Signal Upgrade Project Plans_2023-07-03 6.8 MB
2578 Monument Blvd Signal Upgrade Project Specs_2023-07-03 5.5 MB