Citywide Arterial and Collector Pothole and Base Repair Pavement Maintenance PJ 2567
The work to be done in general consists of: mobilization, traffic control, storm water pollution control program, remove and replace HMA, loop detector installation, adjust utility covers to finish grade; and such other items or details that are required by the Standard Specifications, the Special Provisions and as directed by the Engineer.
Addendum 1
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | |||
| PJ 2567 Addendum No.1 | 318.1 KB |
Addendum 2
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | |||
| 2567 Addendum 2 | 1.0 MB |

