West Concord Ironhorse Trail Connection Project 2499
Curb, gutter and sidewalk reconstruction,detectable warning surfaces,paving,installing City furnished RRFB and signage, pavement delineation, traffic control;and such otheritems or detailsthat are required by the Plans, Standard Specifications, the Special Provisions and as directed by the Engineer.
Specifications
(click to expand/collapse)

Name | Size | ||
PJ2499 Final Specs | 6.2 MB | ||
PJ2499 NTC | 156.8 KB |