Citywide Sidewalk Repair Project No. 2666
The work to be done in general consists of mobilization; traffic control and pedestrian detours; water pollution controls; clearing and grubbing; removal & replacement of concrete sidewalk, curb & gutter; tree root protection; placement of shoulder backing material; curb paint; and all other work shown on the Plans and as specified in these Special Provisions.
Addendum 1
(click to expand/collapse)
Name | Size | |||
2024-2-8_2666 Addendum No 1 | 190.2 KB |