2023 Citywide Asphalt Patch Repair Project, PJ 2593-2

The work to be done in general consists of mobilization; traffic control plan development; water pollution control program; cold planing; placement of hot mix asphalt materials; pruning and removing tree roots; lowering and adjusting utility covers to finish grade; removal and replacement of traffic striping and pavement markings; installation of shoulder backing; removal and replacement of loop detectors; and all other work shown on the Plans and as specified in these Special Provisions.
Plans (click to expand/collapse)
Name Size
220411-01_PJ#2593-2_Plans 7.7 MB