Pavement Maintenance – Zone 4 No 2444
The work to be done in general consists of mobilization; traffic control; water pollution control program; cold planning of asphalt roadway section; crack sealing; placement of rubberized hot mix asphalt (RHMA); removal & replacement of hot mix asphalt (HMA); removal & replacement of concrete sidewalk, curb & gutter, curb ramps, driveways and valley gutters; construction of island passageways; pruning and removal of trees and tree roots; lowering and adjustment of utility covers to finish grade; removing and replacing speed humps; removal & replacement of traffic striping and pavement markings; removal and replacement of roadside signs. The estimated construction cost for the project is approximately $2.57 million.
Status
Bidding Closed
Bid Date | 1/21/21 2:00pm |
Company & Contacts
City of Concord - Engineering Services
Ali Hatefi
ali.hatefi@cityofconcord.org
Location
Concord, CA