Citywide Arterial & Collector Maintenance No. 3 - PJ No. 2616
The work to be done in general consists of mobilization; traffic control; water pollution control program; clearing, grubbing trimming and root pruning; cold planning of asphalt roadway; placement of Hot Mix Asphalt (HMA) materials; crack sealing; slurry seal and rubberized cape seal; lowering and adjusting utility covers to finish grade; curb ramp and concrete improvements; removal and replacement of traffic striping; and all other work shown on the Plans and as specified in these Special Provisions.
Status
Bidding Closed
Bid Date | 7/11/24 2:30pm |
Location
Concord, CA
The estimated construction cost for the Base Bid is $800,000.