Citywide Protected Left-Turn Phasing Project, PJ 2575
The work to be done in general consists of mobilization, traffic control, storm water pollution control, potholing of existing utilities, clearing and grubbing, traffic signal modifications including installation of traffic signal poles, replacement of vehicles and pedestrian signal heads, replacement of traffic signal controller cabinets and controllers, installation and configuration of video vehicle detection systems, traffic striping and markings, curb ramp installation, and all other work as specified in these Special Provisions and shown in the Drawings.